Critical Path color icon
The color version of the critical path line icon: the same drawing with a soft fill behind it. Pick any color and the fill follows. Also in solid.
16
20
24
32
48
Style
Color
PNG size
Free for personal and commercial use. No attribution required.
<svg xmlns="http://www.w3.org/2000/svg" width="24" height="24" viewBox="0 0 24 24"><g fill="#a1d8f7" stroke="none"><path fill-rule="evenodd" d="m5.47 9.38-.91-.33-.98-.02-.88.27-.79.55-.53.68-.33.92-.02.97.27.88.34.55.4.42.48.34.55.24.57.13.59.01.58-.1.67-.27 3.73 3.28-.18.67-.02.65.1.59.27.66.39.54.53.46.58.31.57.17.77.04.71-.14.6-.27.62-.49.52-.73.27-.75.05-.84-.2-.87 3.73-3.28.73.28.71.1.66-.07.67-.22.57-.35.5-.51.4-.67.19-.63.04-.77-.14-.71-.27-.6-.44-.57-.79-.58-.93-.29-.98.02-.92.33-3.73-3.28.18-.67.02-.65-.1-.59-.27-.66-.35-.49-.47-.44-.62-.36-.63-.19-.77-.04-.71.14-.6.27-.62.49-.52.73-.27.75-.05.84.2.87ZM13 7.83l.48-.22 3.73 3.29-.16.54-.05.53.05.59.16.54-3.73 3.29-.48-.23ZM6.79 10.9l3.73-3.29.48.22v8.34l-.48.22-3.73-3.29.16-.54.05-.53-.05-.59Z"/></g><g fill="none" stroke="#1d4963" stroke-width="2" stroke-linecap="round" stroke-linejoin="round"><circle cx="4" cy="12" r="2"/><circle cx="12" cy="5" r="2"/><circle cx="12" cy="19" r="2"/><circle cx="20" cy="12" r="2"/><path d="m5.9 10.35 4.2-3.7m3.8 0 4.2 3.7m-12.2 3.3 4.2 3.7m3.8 0 4.2-3.7M12 7.5v9"/></g></svg>Want it moving? See the animated critical path icon.